Skip to main content

Benefits Calculator

Adjust parameters to see how the utilidor delivers $110M–$140M+ in annual operational savings. All figures are estimates based on publicly available data and industry benchmarks.

Interactive Calculator

Adjust Parameters

2.0 GW

2000 MW — $0.0M/yr savings

13
$0.050/kWh

Per-kWh rate for power savings calculation

$0.03$0.1
4

Underground routing eliminates surface disruptions

110
700,000

700K GPUs across both facilities

100,0002,000,000

Total Annual Benefit

$266.5M

10-Year Cumulative

$2.67B

Savings Breakdown

Power Savings (150 MW, 3% loss reduction)$35.0M
Downtime Avoidance (weather-proof tunnel)$192.0M
Cooling Efficiency (12,000 GPM, 85 MW thermal)$6.5M
Transport (90 trips/day, no escorts)$18.0M
Fiber Latency (20,736 strands, 16.6 Pb/s)$15.0M
* * *

Financial Projections

Annual Savings by Category ($M)

10-Year Cumulative Savings ($B)

With vs. Without Tunnel (10-Year)

Without Tunnel

$1.84B

Total operational exposure over 10 years

With Tunnel

$150.0M

One-time construction cost, massive savings