Benefits Calculator
Adjust parameters to see how the utilidor delivers $110M–$140M+ in annual operational savings. All figures are estimates based on publicly available data and industry benchmarks.
Interactive Calculator
Adjust Parameters
2.0 GW
2000 MW — $0.0M/yr savings
13
$0.050/kWh
Per-kWh rate for power savings calculation
$0.03$0.1
4
Underground routing eliminates surface disruptions
110
700,000
700K GPUs across both facilities
100,0002,000,000
Total Annual Benefit
$266.5M
10-Year Cumulative
$2.67B
Savings Breakdown
Power Savings (150 MW, 3% loss reduction)$35.0M
Downtime Avoidance (weather-proof tunnel)$192.0M
Cooling Efficiency (12,000 GPM, 85 MW thermal)$6.5M
Transport (90 trips/day, no escorts)$18.0M
Fiber Latency (20,736 strands, 16.6 Pb/s)$15.0M
* * *
Financial Projections
Annual Savings by Category ($M)
10-Year Cumulative Savings ($B)
With vs. Without Tunnel (10-Year)
Without Tunnel
$1.84B
Total operational exposure over 10 years
With Tunnel
$150.0M
One-time construction cost, massive savings